ACTIVITIES AND PANELS

Thursday, March 27, 2025

2:00 PM – 3:00 PM

Walmart HQ: Case Study Deep Dive

Oregon Ballroom 204
Track 1
1.0 AIA/CES HSW/LUs, 1.0 PDH credits, or 0.10 ICC credits

Moderator:

Brian Brashaw
Assistant Director
USDA Forest Service
View Bio

Case Study: Walmart New Home Office Campus

Walmart’s new home office campus in Bentonville, Arkansas is setting the standard for corporate headquarters, from its amenities (access to fitness, fresh air, and child care) to its sustainability (integrating technology, renewable energy and materials).

Across its 350-acre campus, Walmart has 2.4 million square feet of office space constructed from regionally and domestically-sourced mass timber — the largest mass timber campus development currently under construction in the U.S. This project has served as a prime environment for understanding all that mass timber has to offer and how to make the most of its sustainability and efficiency throughout the design, engineering, and construction process.

In this case study presentation, Gensler, Fast + Epp, and Shawmut Design and Construction will share their findings throughout the project lifecycle, from time and cost savings, to procurement considerations, to the critical need for collaboration.

Robert Grove
Technical Director, AIA, LEED AP BD+C, RID
Gensler
View Bio
Carla Dickof
Associate Principal & Director of Research and Development
Fast + Epp
View Bio
Dan Dumke
Senior Director
Shawmut Design and Construction
View Bio

Session CEUs: Course Description and Learning Objectives

Course Description

Walmart’s new home office campus in Bentonville, Arkansas is setting the standard for corporate headquarters, from amenities to sustainability. Across the 350-acre campus, Walmart has 2.4 million square feet of office space constructed from regionally and domestically-sourced mass timber—making it the largest mass timber campus development currently under construction in the U.S. This project has served as a prime environment for understanding all that mass timber has to offer and how to make the most of its sustainability and efficiency throughout the design, engineering, and construction process.

In this case study presentation, Gensler, Fast + Epp, and Shawmut Design and Construction will share their findings throughout the project lifecycle, including time and cost savings, procurement considerations, and the critical need for collaboration.

Learning Objectives

  1. Explore how mass timber enhances occupant health and wellness by connecting occupants to nature through biophilic design.
  2. Examine the procurement process for mass timber, including the benefits and challenges of using regionally and domestically-sourced materials to support sustainability and economic development.
  3. Discover how early and integrated collaboration between architects, engineers, and contractors led to efficiencies in time, cost, and resource allocation throughout the project lifecycle.
  4. Understand how mass timber can contribute to corporate sustainability goals through carbon reduction and sustainability metrics.